Hi all :icon_biggrin:
I do have a couple of Warmoth builds to finish, some necks to tidy up …… nothing on order from Warmoth at present. SO ……
I finally traded in my SG 61' reissue Gibo. :toothy10: My Warmoth SG Yella Terra crapped all over it.
arty07:
Anyway ….
The other week I wanted to move something around in my home studio / man cave.
Well since I've been adding different units etc slowly over time, when I wanted to move something, it became the case of ……
OH CRAP :doh:
Undo this, pull that though, untangle that though there, what the hell do those wires go to. :dontknow:
Unplug this, before moving that, move that before moving this, don't pull that, it's connected to this.
Un-tape those wires before disconnecting that ….. (Good thing most was labelled anyway)
Think you get the idea thou. :laughing7:
So I left it just as it was, for now …….. But have worked out what is needed and have ordered bits.
1st off, I scored a freebie (like new) table / desk with 2 draws. Bigger than I had before and more solid and better wood …… Perfect !!
I already have a set of Alesis MkII active Monitors, that i've used for a while.
But … have now added, a set of Adam A7X (well there still in the box) …… Should rattle the windows.
http://www.adam-audio.com/en/pro-audio/products/a7x/description
To make things easier, I'm going to a rack system, will have 2 x 16u cabinets side by side next to the table.
Keyboard and Access Virus Ti Synth and extra screen on top of those u cabinets.
All my other stuff, i'll stuff it into the rack. Sliding draws etc.
:icon_scratch: Mmmmmmm …. an excuse to buy some other rack units. :help:
I have a Hosa patchbay to make patching / changing this into that etc sooooooooo much easier.
That'll be the fun bit to set up.
Label everything is the key thou.
Pic's to come, when it's done.
Cheers
ccasion14:
I do have a couple of Warmoth builds to finish, some necks to tidy up …… nothing on order from Warmoth at present. SO ……
I finally traded in my SG 61' reissue Gibo. :toothy10: My Warmoth SG Yella Terra crapped all over it.

Anyway ….
The other week I wanted to move something around in my home studio / man cave.
Well since I've been adding different units etc slowly over time, when I wanted to move something, it became the case of ……
OH CRAP :doh:
Undo this, pull that though, untangle that though there, what the hell do those wires go to. :dontknow:
Unplug this, before moving that, move that before moving this, don't pull that, it's connected to this.
Un-tape those wires before disconnecting that ….. (Good thing most was labelled anyway)
Think you get the idea thou. :laughing7:
So I left it just as it was, for now …….. But have worked out what is needed and have ordered bits.
1st off, I scored a freebie (like new) table / desk with 2 draws. Bigger than I had before and more solid and better wood …… Perfect !!
I already have a set of Alesis MkII active Monitors, that i've used for a while.
But … have now added, a set of Adam A7X (well there still in the box) …… Should rattle the windows.
http://www.adam-audio.com/en/pro-audio/products/a7x/description
To make things easier, I'm going to a rack system, will have 2 x 16u cabinets side by side next to the table.
Keyboard and Access Virus Ti Synth and extra screen on top of those u cabinets.
All my other stuff, i'll stuff it into the rack. Sliding draws etc.
:icon_scratch: Mmmmmmm …. an excuse to buy some other rack units. :help:
I have a Hosa patchbay to make patching / changing this into that etc sooooooooo much easier.
That'll be the fun bit to set up.
Label everything is the key thou.
Pic's to come, when it's done.
Cheers
