Got a little more done, but waiting on the bridge to get here to finish out the routing, etc... The bridge is taking forever to get here. Drilled the holes for the neck, and mounted the neck to it. The neck pocket is tad larger than I would have liked, but not a big deal. I was watching a Stew Mac vid, where it shows them running tape along the inside of the template to tighten up the tolerances so I'll be doing that on the next one. Living and learning! Also drilled out the holes for the control.