With the last few extra dollars I needed for my warmoth guitar coming from Santa(santa's I should say), I went aheadand placed my order today .
-One peice mahogany strat body with AAAAA quilted maple top.
-Contoured heel, HSH routing, Wilkinson trem, white pearl pickguard
-Green dye top, Trans green back, and black burst over.
-Maple Neck, Ebony Fretboard
- SS6105 frets, graphite nut, Planet Wave tuners
Pickups(didn't order from warmoth, sorry) :-(
- All white. Duncan JB(bridge), SSL-1(mid), Stag Mag(neck)
- All chrome knobs and switches. (even the 5 way)
I'm gonna crazy wire it with 2 on/on/on for the humbuckers and an "all on" for the bridge, with a 5 way, to give it 31 possible pickup combinations.
Anyway.....
Since I've been dreaming day and night for the past, I don't know how many years, and have actually had an excel spreadsheet on my computer at work for the past two mapping out this guitar and pricing every last part.......
What the hell do I do with myself for the next 3 months while I wait? 10 to 12 weeks means that from today, december 27th, it's not gonna get here till mid to late March. Then by the time I set it up, sheild, wire, etc, etc... we're talking maybe April before I can finally play it.
Still... This is awesome... :cool01:
I ordered over and hour ago and I just can't sit still. My heart is still beating a little fast. Time to go have a beer and celebrate.
erik
-One peice mahogany strat body with AAAAA quilted maple top.
-Contoured heel, HSH routing, Wilkinson trem, white pearl pickguard
-Green dye top, Trans green back, and black burst over.
-Maple Neck, Ebony Fretboard
- SS6105 frets, graphite nut, Planet Wave tuners
Pickups(didn't order from warmoth, sorry) :-(
- All white. Duncan JB(bridge), SSL-1(mid), Stag Mag(neck)
- All chrome knobs and switches. (even the 5 way)
I'm gonna crazy wire it with 2 on/on/on for the humbuckers and an "all on" for the bridge, with a 5 way, to give it 31 possible pickup combinations.
Anyway.....
Since I've been dreaming day and night for the past, I don't know how many years, and have actually had an excel spreadsheet on my computer at work for the past two mapping out this guitar and pricing every last part.......
What the hell do I do with myself for the next 3 months while I wait? 10 to 12 weeks means that from today, december 27th, it's not gonna get here till mid to late March. Then by the time I set it up, sheild, wire, etc, etc... we're talking maybe April before I can finally play it.
Still... This is awesome... :cool01:
I ordered over and hour ago and I just can't sit still. My heart is still beating a little fast. Time to go have a beer and celebrate.
erik